Delivering Remediation Works to Restore Reactor Vent Stack Support Beam

Protecting Critical Infrastructure At EDF’s Hartlepool Power Station, CSC Services was tasked with carrying our essential remediation works on a reactor vent stack support beam. These stacks, towering 120 metres high, play a vital role in the safe and reliable operation of the plant. Any structural weakness could lead to costly downtime during statutory shutdowns, […]

Pump Eye Concrete Repair at EDF Hartlepool Power Station

Pump Eye Concrete Repair at EDF Hartlepool Power Station Supporting a Critical Cooling Water System As part of our long-standing support for EDF Hartlepool Nuclear Power Station, CSC Services recently delivered essential concrete repairs within the cooling water intake system. Our team was tasked with restoring the pump eye intake – a key component responsible […]

Concrete Repairs to High Voltage Substation

Delivering Safe, Accurate Concrete Repairs in a High-Risk HV Environment CSC Services was appointed to carry out essential concrete repairs to structural columns supporting critical switchgear within a high-voltage substation. Although the repair itself was technically straightforward, the environment demanded meticulous planning, specialist expertise and a strong safety-first approach.  To protect both our team and […]

Service Reservoir Refurbishment

CSC Services successfully delivered the refurbishment of a service reservoir to ensure the continued safe storage of clean, treated water. As these structures play a vital role in preventing contamination before water reaches customers, maintaining their condition is essential for both asset resilience and regulatory compliance.  Initial Assessment and Repair Approach Our inspection identified significant […]

Concrete Remediation Programme

CSC Services has completed a Spalling Concrete Remediation Programme at Hinkley Point B Power Station for client EDF Energy. The work follows on from the previous programme and has seen over 300 significant repairs completed at the Power Station over a 6- month period. Project With widespread areas of spalled reinforced concrete across the station, […]

Anti-Corrosion Coating Work

CSC Completed Anti-Corrosion Coating Work at Lynemouth Power Station. Working on behalf of Sir Robert McAlpine, we installed a cementitious coating system to the new rail intake area. Due to the coastal location of the Power Station and the industrial operating environment Cemprotec E942 had been specified for the work. E942 is made by Flexcrete Technologies. It incorporates the benefits of […]

Sika Repairs at North Tees Hospital

CSC Services used a range of Sika Repair mortar and bonding primers to rectify areas across the building where degradation of reinforced concrete has resulted in spalling due to environmental exposure and water ingress. Sika MonoTop 610, a cementitious polymer modified primer was used to protect exposed areas of rebar, and Sika MonoTop 615 was […]

Concrete Remediation at Hinkley Power Station

CSC Services successfully completed a Concrete Remediation Programme at Hinkley Point B Power Station for client EDF Energy. Over ten tonnes of specialist repair mortars and structural strengthening products were used to rectify the degradation of reinforced concrete at various areas across the station. A combination of environmental exposure, water ingress and the age of […]

Surface Water Chamber Refurbishment

Restoring Protection for a Critical Drainage Asset CSC Services refurbished a surface water drain chamber at Dungeness B Power Station for EDF Energy. The chamber forms an essential part of the site’s drainage network and is also the authorised minor discharge route for waste condensate water.  Although structurally sound, the chamber had developed voids within […]

Sika Repair Mortars used on NHS Contract

Delivering Essential Concrete Repairs in a Live Hospital Environment CSC Services successfully delivered a programme of concrete refurbishment works at the University Hospital of North Tees, using a range of Sika Repair Mortars to restore ageing structures. The project was completed within budget, to tight timescales and with meticulous planning to protect public safety and […]