Epoxy Resin Concrete Repair: Sika Crack Injection Waterproofing

During refurbishment works to the soffit of a Sunderland University building over 170 metres of cracks were identified. The team at CSC Services were tasked with emergency repairs, as well as the wood treatment to protect against future problems. A Sika crack injection system was used to seal and repair the overhead cracks. This particular […]

Structural Strengthening through Carbon Fibre Wrapping

We installed an innovative solution for structural carbon strengthening at Hinkley Point B Power Station for client EDF Energy. At CSC Services we have used structural carbon strengthening to add structural strength to the DW Plinths in the Turbine Hall. Carbon fibre is lightweight and its tensile strength is very high. Its ability to add […]

Drum Screen Remediation Work at EDF Hartlepool

An extensive project The station’s two reactors power more than two million homes – and its regular mandatory maintenance periods require extensive planning with the National Grid to minimise disruption to the network. With more than 12,000 separate pieces of work taking place during the nine-week shutdown, our experienced teams knew the stakes were high […]

Concrete Protection at North Tees Hospital

CSC Services have been undertaking a programme of work based on concrete protection at University Hospital North Tees. The age of the buildings combined with environmental factors has resulted in spalling of concrete at various areas across the hospital. Defective concrete has been removed and concrete repairs undertaken using cementitious repair materials. To prolong future use of the […]