Concrete Remediation Works: Restoring Public Sector Infrastructure
Delivering Trust Through Expertise At CSC Services, we understand that ageing concrete structures in the public sector demand more than just patch repairs, they require robust, future-proof solutions. When spalling and deterioration began to affect several reinforced concrete structures at a UK public sector site, our team was called upon to provide specialist concrete remediation […]
Delivering Remediation Works to Restore Reactor Vent Stack Support Beam
Protecting Critical Infrastructure At EDF’s Hartlepool Power Station, CSC Services was tasked with carrying our essential remediation works on a reactor vent stack support beam. These stacks, towering 120 metres high, play a vital role in the safe and reliable operation of the plant. Any structural weakness could lead to costly downtime during statutory shutdowns, […]
Pump Eye Concrete Repair at EDF Hartlepool Power Station
Pump Eye Concrete Repair at EDF Hartlepool Power Station Supporting a Critical Cooling Water System As part of our long-standing support for EDF Hartlepool Nuclear Power Station, CSC Services recently delivered essential concrete repairs within the cooling water intake system. Our team was tasked with restoring the pump eye intake – a key component responsible […]
Concrete Repairs to High Voltage Substation
Delivering Safe, Accurate Concrete Repairs in a High-Risk HV Environment CSC Services was appointed to carry out essential concrete repairs to structural columns supporting critical switchgear within a high-voltage substation. Although the repair itself was technically straightforward, the environment demanded meticulous planning, specialist expertise and a strong safety-first approach. To protect both our team and […]
Service Reservoir Refurbishment
CSC Services successfully delivered the refurbishment of a service reservoir to ensure the continued safe storage of clean, treated water. As these structures play a vital role in preventing contamination before water reaches customers, maintaining their condition is essential for both asset resilience and regulatory compliance. Initial Assessment and Repair Approach Our inspection identified significant […]
Reservoir Upstand Refurbishment
Reservoir Upstand Refurbishment for Severn Trent Water CSC Services recently completed a specialist refurbishment project for Severn Trent Water, delivering improvements to a reservoir upstand to help restore asset performance and prevent future contamination risks. Tackling a Bacterial Fail with Targeted Repairs As part of the scheme, our team raised and recast an access hatch […]
Power Station Leak Sealing and Resin Injection
Leak Sealing & Resin Injection Refurbishment CSC Services recently returned to Lynemouth Power Station to deliver a programme of essential leak sealing and resin injection works on behalf of Sir Robert McAlpine. Our teams were asked to support ongoing upgrades across the site as the station continues its transformation into a modern, biomass-fuelled power plant supplying […]
Leak Sealing to Cable Trench Covers
CSC Services recently completed essential leak sealing works to cable trench covers at Hartlepool Power Station on behalf of EDF Energy. The station had been experiencing persistent water ingress due to deterioration of the original concrete cable covers – an issue that had begun to affect the fire protection system within the Turbine Hall Cable […]
Hydrophobic Polyurethane Foam Injection
Stopping Leaks with Advanced Resin Injection CSC Services recently completed a critical injection resin project at a water treatment plant, targeting cracks in a bunded area where water was seeping through construction joints. To tackle this challenge, our team used a hydrophobic polyurethane foam, a fast-acting solution that reacts on contact with water to quickly […]
Concrete Remediation Programme
CSC Services has completed a Spalling Concrete Remediation Programme at Hinkley Point B Power Station for client EDF Energy. The work follows on from the previous programme and has seen over 300 significant repairs completed at the Power Station over a 6- month period. Project With widespread areas of spalled reinforced concrete across the station, […]