Hydrophobic Polyurethane Foam Injection

Stopping Leaks with Advanced Resin Injection CSC Services recently completed a critical injection resin project at a water treatment plant, targeting cracks in a bunded area where water was seeping through construction joints. To tackle this challenge, our team used a hydrophobic polyurethane foam, a fast-acting solution that reacts on contact with water to quickly […]

Concrete Remediation Programme

CSC Services has completed a Spalling Concrete Remediation Programme at Hinkley Point B Power Station for client EDF Energy. The work follows on from the previous programme and has seen over 300 significant repairs completed at the Power Station over a 6- month period. Project With widespread areas of spalled reinforced concrete across the station, […]

Anti-Corrosion Coating Work

CSC Completed Anti-Corrosion Coating Work at Lynemouth Power Station. Working on behalf of Sir Robert McAlpine, we installed a cementitious coating system to the new rail intake area. Due to the coastal location of the Power Station and the industrial operating environment Cemprotec E942 had been specified for the work. E942 is made by Flexcrete Technologies. It incorporates the benefits of […]

Sika Repairs at North Tees Hospital

CSC Services used a range of Sika Repair mortar and bonding primers to rectify areas across the building where degradation of reinforced concrete has resulted in spalling due to environmental exposure and water ingress. Sika MonoTop 610, a cementitious polymer modified primer was used to protect exposed areas of rebar, and Sika MonoTop 615 was […]

Concrete Remediation at Hinkley Power Station

CSC Services successfully completed a Concrete Remediation Programme at Hinkley Point B Power Station for client EDF Energy. Over ten tonnes of specialist repair mortars and structural strengthening products were used to rectify the degradation of reinforced concrete at various areas across the station. A combination of environmental exposure, water ingress and the age of […]

Surface Water Chamber Refurbishment

Restoring Protection for a Critical Drainage Asset CSC Services refurbished a surface water drain chamber at Dungeness B Power Station for EDF Energy. The chamber forms an essential part of the site’s drainage network and is also the authorised minor discharge route for waste condensate water.  Although structurally sound, the chamber had developed voids within […]

Sika Repair Mortars used on NHS Contract

Delivering Essential Concrete Repairs in a Live Hospital Environment CSC Services successfully delivered a programme of concrete refurbishment works at the University Hospital of North Tees, using a range of Sika Repair Mortars to restore ageing structures. The project was completed within budget, to tight timescales and with meticulous planning to protect public safety and […]

Leak Sealing by Resin Injection Crack Repair

Restoring Watertight Integrity in a Busy City Centre Building CSC Services recently completed a resin injection crack repair project on a basement structure in the heart of Newcastle. The building had begun to experience water ingress, and with its durability and watertightness compromised, a fast and reliable repair was essential. Our team was brought in […]

Epoxy Resin Concrete Repair: Sika Crack Injection Waterproofing

During refurbishment works to the soffit of a Sunderland University building over 170 metres of cracks were identified. The team at CSC Services were tasked with emergency repairs, as well as the wood treatment to protect against future problems. A Sika crack injection system was used to seal and repair the overhead cracks. This particular […]

New phase of concrete remediation work completed at North Tees Hospital

We’ve recently completed the next phase of an extensive planned concrete remediation work at the University Hospital of North Tees, following previous successful phases. For this part of the project, we completed refurbishment works on the building which houses plant rooms, specialist operating theatres and recovery rooms. Due to the sensitive nature of the building we were […]