Deterioration of the previous concrete cable covers had resulted in water ingress. This was having ramifications with the Station’s fire protection system in the Turbine Hall Cable Tunnels.
“CSC Services did a brilliant job. The job went really well and the positives have been seen instantly as there has been a significant reduction in moisture which I hope will stay that way.”
CSC Services provided a fully comprehensive service and solution to an issue that we have had for some time. We had an issue of water ingress into one of our fixture holding pits which was creating a health and safety issue. CSC services have eradicated the water ingress issue without any additional civil work, with the fixture still in position. In terms of quality and cost CSC Services have provided a perfect solution, I would not hesitate to use them again in the future.
Terry Weldrake - Work Engineering Group at Hartlepool Power Station