Emergency Leak Sealing Project
Our team was recently called out to an emergency leak sealing project on a new-build wind farm. Speed of completion was key as weather was inclement and the site was about to take delivery of expensive equipment that required protection. Work included: Identifying and marking up the location of the leaks before drilling at specified […]
Emergency Repair Work Continues
Following emergency leak sealing work to the inlet culvert at Dungeness B Power Station last month, CSC Services are now undertaking emergency concrete repairs at Hinkley Point B Power Station. Within 48 hours of the emergent culvert leaks coming to the fore at Dungeness B Power Station, CSC Services were on site completing the leak […]
Restoring Cracked Wet Well
Work to restore the structural integrity of a cracked wet well was completed for Anglian Water. The transfer of ownership of thousands of private pumping stations to water companies in 2016 amounted to significant, and often problematic additions to their asset bases. Periodic maintenance and cleaning of wet wells is essential to avoid blockages. With […]
Concrete Repairs at Power Station
A scheme of 24-hour essential maintenance, including concrete repairs, at Hartlepool Power Station will soon be completed for client EDF Energy. Once again CSC Services have been working at the North East Power Station during the planned shut-down of one of the reactors. The inlet and outlet culverts; cooling water intake areas and water boxes […]
Culvert Repairs at Power Station
CSC Services returned to Dungeness B Power Station to complete a scheme of culvert repairs for client EDF Energy. Visual inspections and remedial works to walls and joints within the cooling water inlet and outlet culverts were commissioned during the stations’ outage period. Repairs were carried out using concrete repair mortar, appropriate leak sealing resin […]
Waterproofing with Resin Injection
CSC services complete waterproofing resin injection work at the neighbouring Komatsu manufacturing plant in Birtley, Tyne and Wear during a factory shutdown. Komatsu were experiencing significant water ingress problems to the concrete base and walls of a holding area due to poor construction and a high water table. With no facility for pumping the water out, the […]