Our team was recently called out to an emergency leak sealing project on a new-build wind farm.
Speed of completion was key as weather was inclement and the site was about to take delivery of expensive equipment that required protection. Work included:
Identifying and marking up the location of the leaks before drilling at specified points above the joint in order to accommodate the injection packer
The holes were then cleaned before injection packers were inserted
The surface of the join was then sealed with banding where appropriate before the resin was applied and any holes cleaned and filled with waterstop plugs
All work was inspected by the site manager on a daily basis
“From initial call, our team was able to complete the job within seven days - with a quality outcome for our client.”