A scheme of 24-hour essential maintenance, including concrete repairs, at Hartlepool Power Station will soon be completed for client EDF Energy. Once again, CSC Services have been working at the North East Power Station during the planned shutdown of one of the reactors.
The inlet and outlet culverts, cooling water intake areas and water boxes have been inspected for spalled concrete, leaking cracks and damaged expansion joints. Concrete repairs have been undertaken, with the process of resin injection and over-banding being used to address leakage and cracks. Specialist protective coatings have been installed to the steel water boxes.
Working for EDF Energy’s contract partner Cape, we have also been installing a cathodic protection system to the drumscreen chamber. Defective concrete has been removed from the structure, steel reinforcement replaced and anodes installed. Following the application of new concrete to profile, GRP ladders, platforms and handrails were then installed.
To ensure the scheme of work has been completed within the designated timeframe, 12-hour day and night shifts were undertaken.
Earlier in the year, CSC Services completed concrete repairs and specialist coating work to the suction eye ahead of the outage.
We specialise in working during statutory outages and planned shutdowns. Work can be scheduled around the clock with the latest products and application techniques used to minimise project timescales.
All of CSC Services’ operatives undertake regular training on the repair and protection of reinforced concrete structures in accordance with BS EN 1504, which is approved by the Institute of Concrete Technology. Our teams all have CSCS cards, EUSR water cards, DOMS, Confined Space Certificates and are BSVR (Baseline Security Vetting Register) and CTC (counter terrorism check) vetted as a minimum.