Corrosion Control Coating for EDF Energy
CSC Services have successfully completed a refurbishment programme for EDF Energy using their latest corrosion control coating system. The Gabion Wall is located behind the main sea wall on the Bristol Channel coast and was installed in response to an extreme tidal surge. Marine exposure and high chloride ingress had taken its toll putting the integrity of the […]
Sika Concrete Repair at Hinkley Point B
This case study highlights a Sika Concrete Repair at Hinkley Point B Power Station Environmental exposure had caused significant concrete spalling to an area of the Gas Turbine House at the Hinkley Point B Power Station. A repair was urgently required to mitigate potential health and safety issues and ensure plant reliability. We worked with […]
Flexcrete Coating at Biomass Plant
A Flexcrete coating system was sprayed on to steelwork at Lynemouth Biomass Power Station for client Sir Robert McAlpine. Protective Coatings at Lynemouth Sir Robert McAlpine were constructing the Materials Handling Facility at the plant in Northumberland. CSC Services installed protective coatings to the new rail offload areas which will receive over one million tonnes of […]
Sika Liquid Roofing System Installed
CSC Services have successfully installed a Sika liquid roofing system at Hartlepool Power Station for client EDF Energy. Sika’s Decothane Ultra was installed to a Pumphouse Roof within the Ferrous Sulphate Plant at Hartlepool Station last month. With a 15-year guarantee from Sika Liquid Plastics, the Decothane Ultra System will outlast the life expectancy of the Power […]
Offsite Protective Coatings
CSC Services have recently completed a job for client EDF Energy to repair and apply offsite protective coatings to Ferrous Sulphate Tank Lids and Steel Walkway gratings The tank lids and walkway gratings were transported from Hartlepool Power Station to the CSC Services work unit for the refurbishment work as part of a plant upgrade. […]
Coatings for Ferrous Sulphate Plant at Hartlepool Station
CSC Services have completed an upgrade to the Ferrous Sulphate Plant at Hartlepool Station for client EDF Energy installing a waterproof coatings system. Failed epoxy coatings were removed from the bund walls, floors, walkways, staircases and handrails. Deep cleaning of pipework, plant and equipment was undertaken using High Pressure Water Jetting and steam cleaning. A Sikalastic 625 […]
Chemical Resistant Coatings for EDF Energy
Work to replace the rubber lining of a vessel forming part of the water treatment plant at Dungeness B Power Station using chemical resistant coatings has been completed for client EDF Energy. The Mixed Bed Regenerator Vessel forms part of the Power Station’s water treatment plant, backwashing, rinsing and injecting resins with sulphuric acid and […]
Cathodic Protection System for EDF Energy
CSC Services have successfully installed a Cathodic Protection System for EDF Energy at Hartlepool Power Station. This was to a corroded Drumscreen Chamber. Corrosion of the reinforced concrete structure had been caused by carbonation and contamination of concrete by sea salt which passes through the Drumscreen Chamber as part of the Power Station’s cooling process. […]