Refurbishment of Service Reservoir Refurbishment of Service Reservoir

Refurbishment of Service Reservoir

  • Share:
  • Facebook
  • Twitter
  • Pintrest
  • Email

18 January 2017
CSC Services have recently refurbished a Service Reservoir. Service reservoirs hold clean water after treatment, before it is piped to end users. Designed to keep water safe from contamination it is vital they are kept in optimum working order.

An initial assessment showed the concrete of the structure was delaminated through water ingress and egress. Leak sealing was achieved through the process of resin injection and the use of a cementitious plug. Flexcrete concrete repair mortar products were specified due to the fact they are fast setting – starting to set rapidly. This was imperative for the project as it reduced disruption to service.

The refurbishment programme restored the structural integrity of the Service Reservoir and will prevent future deterioration. Flexcrete products have excellent resistance to pure water and low carbon dioxide permeability.

CSC Services has over twenty years of experience in refurbishing and protecting water and wastewater structures to mitigate risk and minimise disruption to services for clients.

All CSC Services’ operatives undertake regular CPD training with Flexcrete to ensure they are kept up-to-date with the latest products, technology and application methods. Flexcrete invests heavily in Research and Development to ensure it can offer the most technologically advanced and innovative repair and protection materials for refurbishment or new build projects.

Images from the work undertaken are below. Leak sealing through resin injection and Flexcrete repair mortars are shown.

Concrete repair   concrete repair

 

Concrete repair   Concrete repair

 

Concrete repair   Concrete repair