Sprayed Concrete at Water Treatment Works

Onsite work at Frankley Water Treatment Works for client NMCN.

The team undertook steel fixing and dry sprayed concrete as part of a scheme of work to refurbish  the plant.

Sikacem 133 Gunite was spray-applied over reinforcement at the Treatment Works. Frankley Treatment Works was upgraded by Doosan North Midland Alliance, a joint venture between Doosan and the newly named Nmcm as part of the Birmingham Resilience Project for Severn Trent Water.

A video and photographs of the work are shown below.